Resolution of manpower shortages

Before

Customer concerns

  • Lack of manpower requires costs of adoption and training
  • Incur personnel costs
  • Visual inspection takes time
  • Difficulty in technology succession
  • Accuracy varies depending on fatigue and physical condition
  • Lack of manpower due to low birthrate and aging

After

Customer feedback after introduction

  • The labor shortage of the inspector and the manager was able to be solved.
  • We were able to reduce personnel costs.
  • We were able to apply inspectors to other works
  • Work style reform was promoted.
  • Stabilize inspection quality
  • Multiple inspection contents such as surface inspection and dimensional inspection could be consolidated by one inspection machine.

Introduction example

Before After
4 Person 1 Person